My job typically doesn't include perspective sketches so contractors know how to build something. But that doesn't mean never. ::le sigh::
Coworker: yeah, the drawing makes sense
Architect: that works, send it to the contractor
Contractor: OMG, how do you expect me to build this, this will never work.
🤦♀️
@PurpleDragon it's three steps, how hard can building three steps be 🤦♀️🤦♀️🤦♀️🤦♀️
🤷♂️ I don't know. There's a door elevation and a sidewalk elevation, 18" between them. Most contractors would just form it and pour it and be on their way. When they get all upset and LOUD about something, I always feel like it's a setup for finger pointing for a cost increase or something else.
@0x56 @PurpleDragon that's good theory
OH DEAR. THIS POST WAS SET TO SELF-DETONATE 💣 💥 🔥
Ą̷͇̀l̵̩̓̕l̸̩͘ ̸̭̪̈́ť̷̝̍̆h̶̡̛̰̯̏͌a̷͕̞͋̂t̵̩͙͑̈́͝'̵̛̍́ͅͅş̴̬̱͝ ̷̗̊͠l̵͚̕͠ē̸̻͓̐͝f̷̧͙̀̑͝t̶͓̓͊̚ ̶̜̱̓͌́a̴͉͊r̶̡̩͛̀é̵̦̞͕ ̶̮̾ṫ̷̡͈̍ḧ̸̛͍́̊e̴̫̅ş̶̥̰̓e̴̟̪͌͂̇ ̷̞̅͊̚h̷̰͕͈͂e̶̡̹̜̚ŗ̸̗͈̾̇e̴̩̍͐ ̷̪͉̩̀a̵̡̱̐͑͝s̴͎͖̈́h̸͈͌́͜e̴͕̝̐̌ś̶͓̆ͅ.̵̩̉ ̵̱͊͑̀