Show more

0:00:27:07 ESC-D stage separates from JWST Altitude 1391 KM 5 Minutes until Solar panel Deploy. Congrats and on a successful launch is on its way to L2 and SCIENCE!

0:00:08:47 EPC core stage separation Altitude 229 KM ESC-D engine start! Have a bout a 16 minute burn

0:00:02:21 EAP solid boosters shutdown and separation Altitude 72 KM

T-00:06:00 No jinx, safety ordinances armed (Self destruct charges) Helium loaded . LOX and LH2 at flight levels. Deep breaths.. deep breaths

T-30 minutes. Board is green, all systems check out, no anomalies reported.

Final call will be at T-10 minutes

Raining really good at the launch site. Not a concern, as long as there is no lighting

T-1 HOUR for opening of 32 minute launch window. There is a planned hold point at T- 7 minutes in case something happens. Like birds, Ballons. Wayward flying reindeers

Broadcast FEEDS ARE LIVE

L-01:15:00 Telemetry, Tracking, Command Systems Checkouts

live feeds up youtube.com/watch?v=21X5lGlDOf

Main engine is being chilled. Propellent is topping off.. that is, it is sloshing around, being vented, and refilled. This goes on until about T- 06:30

’Twas the night before launch,
And all through Kourou,
The teams are a go, and the weather is to!
The rocket rolled out to the launchpad with glee,
Join us for the world's biggest launch watch party!

Coverage starts at 6AM ET (11 UTC): nasa.gov/live

Also note, The 5 Rocket that will launch has its Main Vulcain 2 Main Engine that will ignite 7 seconds before the Solid Rocket boosters. The SRB will provide over 80% of the Thrust needed to get to L2

Show more

ꜱᴛᴇᴇʟ ʀᴀᴛ ɢᴀᴍᴇʀ

CounterSocial is the first Social Network Platform to take a zero-tolerance stance to hostile nations, bot accounts and trolls who are weaponizing OUR social media platforms and freedoms to engage in influence operations against us. And we're here to counter it.